THE ROPE COMPLIANCE PROGRAM: OFFSHORE CRANES

We write the rope inspection and maintenance program for every offshore crane in your fleet, to API RP 2D.

API RP 2D requires every crane owner to have a written wire rope policy, including rejection criteria. We write the inspection side of it for each crane.

Book a free 15-minute call

API RP 2D (2020 Addendum) sets inspection intervals by how much each crane is used: pre-use for every crane, monthly for heavy usage, quarterly for moderate and heavy usage, and annual for all. The Rope Compliance Program writes a wire rope procedure for each of those inspections and works out the rejection criteria for the rope installed on each winch.

Every operator and inspector knows what to check, where to measure, and when a rope is done.

What you get

A procedure for every API RP 2D inspection

InspectionWhenCodeClause
InitialNew crane placed in service, crane permanently relocated, or temporary crane; by a qualified inspectorShall5.1.3.2
Pre-usePerformed and documented before the crane’s first use of the day, before or during each change of crane operator, and during the day for extended operations as the qualified crane operator deems necessary; all usage categories; by a qualified crane operator (a qualified inspector may also)Shall5.1.3.3
MonthlyOnce a month for heavy usage cranes (50 h a month or more), by a qualified crane operator (a qualified inspector may also); infrequent usage cranes idle 3 months or more get a monthly inspection and a full function checkShall5.1.3.4, 5.1.2.2
Wire rope at pre-use and monthlyVisual inspection of the wire rope by a qualified crane operatorShould6.2.2.2
QuarterlyOnce every 3 months for moderate and heavy usage cranes, by a qualified inspectorShall5.1.3.5
AnnualEvery crane, once every 12 months regardless of usage, by a qualified inspectorShall5.1.3.6.1
Wire rope at quarterly and annualAdditional wire rope inspection (F.2) by a qualified inspector, as the pre-use and monthly results warrantShould6.2.2.2
Out of service over 12 monthsAnnual inspection before the crane returns to serviceShall5.1.3.6.2
New ropeInstall and break in the rope as the manufacturer recommendsShallF.6.9
New rope measurementsRecord initial rope measurements in the crane file at installationShould6.2.1, F.6.9
Rope changeCheck the areas that affect rope performance and lifeShould6.2.2.4
RecordsKeep wire rope inspection records and record every deficiency foundShall6.2.3.2

Written to API RP 2D (2020 Addendum). Shall and Should show how the standard words each item. Our recommendations are kept separate from code requirements.

Usage categories are set by hours of use per month, averaged over a quarter: infrequent 10 h or less, moderate over 10 h and under 50 h, heavy 50 h or more (API RP 2D 5.1.2).

Every winch checklist includes

  • Rope spec and initial measurements
  • Diameter reduction limit for the installed rope
  • Broken wire limits for that construction
  • Where to measure on that winch
  • Sheave groove checks with a groove gauge

Rope life strategies for each rope

  • Lubrication and cleaning
  • Drum tension and spooling
  • Sheave groove checks
  • Slip and cut
  • Rope length set so the drum takes tension away from a layer step-up
  • New rope installation and break-in

Price

US$280 per winch, per year

Priced per serial number. Every winch used in lifting service on an enrolled crane is included.

No site visit. No crane downtime. No change to your inspector.

Start with three cranes, pay for two

Enroll two cranes and we add a third free for year one. Add the rest of your fleet once you have seen the checklists.

Guarantee

Not satisfied after your first review? Full refund.

How to start

  1. Book a free 15-minute call.
  2. Send the OEM manual, crane logbook and mill certs for the cranes you choose.
  3. Your checklists arrive within 10 business days.

Book a free 15-minute call

The Rope Compliance Program for other standardsCSA Z150 (mobile cranes)CSA Z248 (tower cranes)ASME B30.30

Every winch used in lifting service is enrolled; reeving and pulling winches used only for rigging or assembly are covered only if you opt them in. The free crane renews at the standard rate. Record rope changes in the logbook and send us the new mill cert and reference diameter; checklists are only as current as the records supplied. Inspection and removal decisions remain with your competent person. Items marked as recommendations are CRS Practice, not code requirements.

Crane Rope Solutions  ·  Dean McDonald
9253 Smith Place, Langley, BC V1M 2R8, Canada  ·  604-813-9473  ·  WhatsApp  ·  [email protected]  ·  About us
All-terrain cranes · Rough-terrain cranes · Crawler cranes · Truck cranes · Tower cranes · Offshore pedestal cranes · Port cranes · Deep foundation rigs · Duty cycle cranes
Liebherr · Grove · Tadano · Kobelco · Bauer · Manitowoc · Demag · Soilmec · Seatrax · Favelle Favco · Krupp · Terex · Casagrande · Jaso · Oil States · RTG (Bauer)
All specifications must be verified before purchase and before installation. Rope specifications can change between machines of the same model and between model years. Confirm against your machine's logbook, reeving and the manufacturer's documentation before ordering. Inspection and discard decisions remain those of your competent person.